Menu Search
01

Old Granada Studios, Manchester

Old Granada Studios, Manchester

Old Granada Studios, Manchester

This 11-storey commercial workspace for the media and creative industries, was developed on the site of the Old Granada Studios site in Manchester. Temporary works were identified as a critical risk item early in the tender process and we engaged with our supply chain to plan solutions before starting on site.

4D logistics and programme models were developed as part of our tender through our ‘Digital by Default’ initiative. Complex site constraints required a collaborative approach, planning high risk items ahead of contract award in detail so that unknown risks could be minimised.

A basement propping solution eliminated the need for a piled wall, significantly reducing the amount of concrete that would become redundant following basement construction, reducing the amount of embodied carbon.

Renewable energy features included:

Our social value target at Old Granada Studios was £2.6 million (22% of project value). Social value created to date = £40 million (33% of project value)

Awards: 

EPC A and Part L

BREEAM Very Good

Considerate Constructors Scheme ‘Excellent’

Nominated for the ICE Constructability Award 2022

 

Latest Projects

Energy House 2.0 is the largest test and research centre of its type in the world.

The built environment accounts for 40% of the UK’s carbon footprint and to achieve net zero will require a step…

Newcastle’s NICD has beauty as well as brains

We’ve successfully completed this multi-award-winning building for the University of Newcastle at Science Central in the city. The six-storey building…

Healthcare centre breathes new life into Cheltenham GP services

Around 25,000 patients in Cheltenham are benefitting from the town’s new healthcare centre which opened its doors last week. The…

View all projects